This document is intended to aid property owners and design professionals understand the regulations applicable to Downtown Superior, formally known as Superior Town Center Planned Development (PD).
Seven distinct Final Development Plans (FDPs), each with its own building standards and regulations, govern this Planned Development. In addition, design in Downtown Superior is regulated by a set of architectural guidelines. The PD, FDP, and Design Guideline documents are linked below and can also be accessed geographically by clicking on the location on the Town's Land Use Map and scrolling to the desired information page in the popup box that appears.
Superior Town Center Planned Development (Amendment 5)
Superior Town Center Design Guidelines (Amendment 3)
Tenant Signage Regulations - Downtown Superior
FDP 2 & 3 Phase 1 // Wonderland Homes - Block 13 & Partial Block 25
FDP 3 Phase 2 // Remington Homes - Partial Block 25
FDP 4 Phase 1 // Thrive Homes - Partial Block 26
FDP 6 & 7 // Thrive Homes - Blocks 14 & 15
FDP 8 // Toll Brothers Homes - Blocks 16-24
FDP 9 & 10 // Remington Homes - Blocks 9-11
Message Planning Email Permitting and Inspections Office: 100 Superior Plaza Way, Suite 200 Planning Phone: 720-738-8835 Building Phone: 303-381-2028 Permit Fees: 720-738-7326
Current Building Codes: 2018 IRC* 2021 IECC* 2023 NEC * Owners of detached single-family homes homes lost in the Marshall Fire are eligible to rebuild under the 2018 IECC Codes and can receive an exemption from the 2018 IRC P2904 Sprinkler Code by signing Marshall Fire Rebuild Affidavit.
Application Checklist for Residential Building Permits
Further document guidance: Grading Requirements Plot Plan Requirements